HomePortfolio

Portfolio Archive - Page 2 of 4 - PEP ENGINEERING

1
2
3

The work for this project involves the rehabilitation of the RL719 road located in the governorate of Siliana.

This mission consists of the construction of a paved road with the following characteristics:

  • A platform for pavement insertion with shoulders in urban areas
  • Asphalt coating
  • Cuttings 32m high per location

Single and multi-cell scupper types of hydraulic structures are also being projected in this project to drain runoff and the draining of road water.

1

The project aims to provide a reliable source of water for irrigation purposes in the Menzel Tmime area by constructing a pumping station on the south bank of the Lebna Dam.

The station will be responsible for pumping water from the dam and distributing it to nearby agricultural areas, thereby promoting agricultural development in the region. This project is expected to increase agricultural productivity and improve the livelihoods of local farmers by providing them with a reliable source of water for irrigation.

kk
plan situation

This project involves the construction of a drinking water supply system for the city of Bangui in the Central African Republic.

The specific objective of this project is to rehabilitate and extend the drinking water supply system of the city of Bangui.

The project components are:

  • Three (03) Pumping Stations
  • One (01) Compact Processing Plant 750 m3/h
  • Two (02) Return Stations
  • Installation of sixty (60) km of pipe
Arru

The project aims at the complete rehabilitation of the urban infrastructures of four (04) zones through the renovation of the main roads, urban sanitation networks, drinking water and public lighting.

The beneficiary areas are:

• El Hafsia located at the delegation of Borj El Amri in the governorate of Manouba.
• Bouraghba located in the delegation of Mornaguia in the governorate of Manouba.
• Dhraa Ben Jouder located in the delegation of El Fahs in the governorate of Zaghouna.
• Saheb El Jbal located at the delegation of El Hawaria in the governorate of Nabeul.

The project is large-scale and aims to significantly improve the existing infrastructure in the urban areas concerned.

2
1
3

The project consists of the reconstruction and rehabilitation of the roads of Porto Novo and Akpro Missérété in 2X2 lanes (60 km), and the development and asphalting of the roads Pobè and Adja Ouèrè (42 km).

The technical characteristics of the layout of the new section are as follows:

  • A platform for pavement insertion
  • 11 Single and multiple scupper type hydraulic structures
  • 01 Pre-stressed Art Work

For the rehabilitation component, the work includes:

  • Reconstruction of a 60 km 2×2-lane road section with asphalt concrete pavement
  • 26 hydraulic structures in the form of single and multiple scuppers
2
1
3

This project concerns the execution of an SP5 pumping station in the industrial area of Medjez El Bab III, including the installation and testing of related electrical and electromechanical equipment.

This area is located southeast of the city of Medjez el Beb, between the regional road RR38 and the road RR49 leading to Gaafour in the governorate of Béja. It covers an area of 102 ha and thus reinforces the existing industrial fabric (Medjez El Bab I & II).

The project components are:

  • Construction of a 250 l/s sewage pumping station
  • Total network length: 13,000 ml
2
1

This project involves the construction and asphalting of Route RL518.

The work of the present mission is part of the improvement of the level of road services. This work will also allow the reinforcement of the road section over 46 km.

The mission includes a reinforced concrete beam bridge designed to cross the wadi.

2
4
3

The work related to the mission concerns the improvement of the X20 ring road between the RR31 and the West Exit in the Governorates of Tunis, Manouba and Ariana.

This project is part of the outer belt of Greater Tunis’s Projects. The planned development consists of the construction of a paved road with the following characteristics:

  • A platform for pavement insertion
  • Coated with asphalt
  • 2 Exchangers
  • 5 Structures of Art Beam Bridges (length between 56 and 186 ml)
  • 36 Hydraulic Structures