Project Management for the Extension of the National Training Centre in Statistics, Demography and Planning (CNFDSP) and the Construction of the Conference Centre of the National Institute of Statistics (INS) in Mpila — Brazzaville (Congo)

This project brings together two distinct operations under a single full Project Management mission...

 

This project brings together two distinct operations under a single full Project Management mission, both located in Mpila, Brazzaville, Republic of Congo. They aim to strengthen institutional capacities in statistics, demography and national planning.

Operation 1 — Extension of the CNFDSP (National Training Centre in Statistics, Demography and Planning):

🏫 Objectives:
• Increase the CNFDSP’s training and accommodation capacity to meet the growing demand for statistician and demographer training in Central Africa;
• Modernise and expand existing educational infrastructure.

Operation 2 — Construction of the INS Conference Centre (National Institute of Statistics):

🏛️ Objectives:
• Provide the INS with a modern conference centre for the organisation of national and regional seminars, workshops and statistical results dissemination events;
• Strengthen the INS’s institutional profile at the national and sub-regional level.

PMC Services (common to both operations):
• Preliminary studies, Schematic and Detailed Design, execution documents;
• Assistance with works tender process (tender documents, bid analysis);
• Works Execution Management (WEM) and scheduling, coordination (OPC);
• Assistance during works reception (AOR);
• BIM integration and coordination across all trades.

 

Field of Activity:
Full PMC — Building Architecture & Engineering
Client:
National Institute of Statistics (INS) — Republic of Congo
Financing:
World Bank
Country:
Republic of the Congo
City:
Brazzaville (Mpila)
Year:
2026